BOMs and stock live in spreadsheets, so shortages surface only on the line.
Multi-level BOMs drive MRP that nets demand against stock and open POs, raising purchase and work orders before a shortage ever stops production.
Manufacturing ERP & shop-floor control
From multi-level BOM and MRP to production orders, quality NCR/CAPA and plant maintenance, EkaTantra runs the whole factory on one system — so every order ships on time and on cost.
14-day free trial · no card · no sales call
98%
on-time dispatch
20%
less raw-material stockout
30%
faster month-end close
1
system for plan to ship
The problems we remove
BOMs and stock live in spreadsheets, so shortages surface only on the line.
Multi-level BOMs drive MRP that nets demand against stock and open POs, raising purchase and work orders before a shortage ever stops production.
Production status is a phone-around — nobody knows real WIP or yield.
Every operation is booked against a work order, so live WIP, scrap, yield and machine load are visible by station and shift.
Quality issues get logged on paper and the same defect repeats.
In-process and incoming inspections raise NCRs that drive CAPA with root-cause and closure tracking, so defects are contained and don't recur.
Costing is a year-end guess once labour and overhead are added.
Each work order rolls up material, labour and machine overhead live, so standard-vs-actual cost and margin per job are always current.
Everything in one place
Engineer phantom, sub-assembly and finished-good BOMs with revisions, scrap factors and where-used lookups.
Net demand against stock, WIP and open POs to auto-suggest purchase and production orders by lead time.
Release work orders, route operations across work centres and book material, labour and machine time.
Incoming, in-process and final inspections raise NCRs, trigger CAPA and quarantine non-conforming stock.
Bin-level stock, lot/batch and serial tracking with full forward and backward traceability.
Preventive schedules, breakdown work orders and spares consumption keep machines and OEE up.
Issue material to vendors, track job-work challans and reconcile returns with GST ITC-04.
Material, labour and overhead roll up per order for true standard-vs-actual cost and margin.
Outward invoices, e-way bills and ITC reconciliation are booked straight from dispatch.
A day in the life
Confirm the order
Sales or stock order explodes the BOM and feeds demand into MRP.
Plan & procure
MRP nets demand against stock and open POs, then raises purchase and work orders.
Produce
Operators book operations, material and machine time against each work order.
Inspect
In-process and final QC pass-or-fail; failures raise NCRs and CAPA.
Dispatch
Finished goods are picked, packed and shipped with invoice and e-way bill.
Close & cost
Work order closes; actual material, labour and overhead settle against standard.
“MRP now raises our work and purchase orders before we run short — the line hasn't stopped for a missing part in months.”
Plant Manager · Precision components manufacturer
Yes — phantom, sub-assembly and finished-good BOMs with revision control, scrap factors and where-used lookups all feed MRP.
MRP nets demand against on-hand stock, WIP and open purchase orders, then suggests production and purchase orders by item lead time.
Yes. Incoming, in-process and final inspections raise non-conformance reports that drive corrective and preventive action with closure tracking.
Material issued to vendors is tracked on job-work challans and reconciled on return, with GST ITC-04 reporting built in.
Related industries